中国熟妇牲交视频-日本高清视频在线www色-欧美日韩精品在线-成人国产一区二区三区精品麻豆-强奷妇系列中文字幕-天堂…中文在线最新版在线-丰满少妇一级-国产有码-精品亚洲a∨无码一区二区三区-伊人久久综合色-欧美日韩国产专区-婷婷久-激情小说综合-精品少妇av一区二区三区-制服丝袜天堂-www国产-巨胸爆乳美女露双奶头挤奶-欧美性猛交xxxx免费视频软件-亚洲成av人片一区二区梦乃-无码国产一区二区免费

EN中文English
020-32583997
13825089207

Is there an imbalance in the amount of water and heat in a large-scale hot water project? Pictures and texts teach you design and installation!

Release date:2021-04-01

Are you still worrying about swimming pool filtration, disinfection and other issues? Click for free consultation and answer your questions one-on-one.

According to many dealers, when doing large-scale hot water or heating projects, uneven flow and heat distribution often occur. Due to the continuous maturity of air energy products and technological advancement, the performance of the unit will not have major shortcomings. Under the premise of reasonable selection of the unit, the uneven distribution of the end heat source is likely to be caused by improper system design during the installation process. The same process installation can avoid this phenomenon.


AQUA case


1. Simultaneous installation is the best way of hydraulic balance
In general, small-scale engineering dealers use remote installations to facilitate installation and save costs. Due to the short length of the pipeline, the difference between each end is not very obvious, so its shortcomings are also ignored. However, there are also some dealers who install flow regulators on each parallel branch for control.
The same process means that the path length of the fluid passing through each device is equal and the resistance is the same. This is also very difficult to understand, because you have to paint by yourself during the actual operation, so it is quite troublesome.
The length of the pipe passing through each parallel loop is basically the same. If the resistance loss through each meter of pipe is nearly equal, the resistance of the pipe network can be kept balanced without adjustment. The same process system can ensure that the water flow through each end is uniform, and prevent insufficient water flow at the remote end to affect the cooling or heating effect. The same process installation is very common in large-scale air-conditioning and refrigeration projects. Because the principles of heat pumps and air-conditioning are similar, they are gradually adopted by some air energy distributors. After continuous testing, they are widely used in large-scale air energy hot water and heating projects.
Taking heating as an example, the backwater of the first group of radiators at the front does not circulate to the main pipe temporarily, but continues to go down through the extension of the pipe, connecting the return pipe of the next group of radiators, and so on, from the end The radiator pulls out a return pipe and returns to the return pipe of the main pipe.
The water flow of each group of radiators in the system is basically the same. The system is very balanced. Generally, there will be no insufficient heat or no heat at the end of the system. It can be said that it is a way to balance the best hydraulic system.


Simultaneous installation is the best way of hydraulic balance

As shown in Figure 1, there are three hosts. Many people install them in this way, but there will be problems with more than five. Just imagine where the water flow is where the resistance is small and where the pipe diameter is short, then it flows there. Uneven distribution will occur. There will be more water flow on the right side, and less and less water flow to the left. This will also cause the temperature difference on the right side to be small. The more the temperature difference is to the left, the greater the temperature difference. Not the same journey.


AQUA case


2. There are many detailed requirements for the host installation in the same process
In order to avoid uneven distribution of the heat source at the end, the same process should be used when installing two or more units in parallel. For the same process, the path length of the fluid through each device must be equal and the resistance must be the same. According to the number of units, there are generally two ways for the host in the same journey:
1. The way of 3 pipes for main road:


Supervisory road 3 tube way
As shown in Figure 2, the rectangle in the figure represents the heat pump host, and the circle represents the circulating water pump.
After the fluid comes out of the water pump, it enters the heat pump host in three ways. Because the lengths of the water inlet pipes of the three hosts are inconsistent, there should be differences in the water outlet pipes, so that the path length of the fluid through each device is equal.
For example, the hosts are arranged in parallel. The inlet pipe of the first host is 3 meters, the second inlet is 4 meters, and the third inlet is 5 meters. If the first outlet is 8 meters, then the second The water outlet pipe of the main engine is 7 meters, and the water outlet pipe of the third main engine is 6 meters, so that the path length of the fluid through each device is 11 meters.


2. Main road ring way


2. Main road ring way

As shown in Figure 3, the rectangle in the figure represents the heat pump host, and the circle represents the circulating water pump: 1 is a circulating water pump (2 units); 2 is a 25P heat pump unit; 3 is a strong electric control cabinet (distribution cabinet); 4 is Weak current control cabinet; 5 is the main water inlet pipe (on the bottom); 6 is the main water outlet pipe (on the top).
There are 5 main engines. Large engineering water pumps need one for one use and one for preparation. After the fluid comes in, it should not pass through the first device first, go to the end first, and then come back. The path lengths of all the devices are the same.
In order to improve the overall efficiency and service life of the system, improve the customer's experience, and at the same time facilitate daily maintenance, the following aspects need to be paid attention to during the installation of the host in the same process
①The side of the unit's own electric control box and the power distribution cabinet are in the front for maintenance; ②The three main inlet and outlet pipes are behind the groups, two inlet pipes are below, and the outlet pipes are on the top; The distance between the pump center is 1.2 meters; ③The center of the water pump is 1.5 meters away from the side panel of the unit; the power distribution cabinet and the weak current cabinet are installed in the middle of the N units, in the same straight line with the front panel of the unit, and the bottom edge is 1.5 meters from the ground. The distance between the unit and the unit should not affect the maintenance of the machine. Each control cabinet can control up to 10 units. For projects with more than 10 units, the control cabinet should be added and the unit control number should be evenly distributed; the interface between the unit and the pump must be installed with a soft Connect to reduce noise and facilitate installation and maintenance; ④For installations on the ground, the unit support should be installed on the concrete foundation, and the concrete foundation platform should be provided with drainage ditch; for installations on the roof, the unit support should be stressed. The waterproof insulation layer should not be damaged; ⑤ Rubber shock-absorbing pads should be installed between the unit and the water pump and the fixed bracket.


AQUA case


Three, the end of the same process and the host at the same time
The terminal equipment of a large-scale hot water or heating project is generally a radiator or fan coil or floor heating. When the host is installed in the same process, only the end can be installed in the same process to ensure the uniform output of the end.
According to the number of hosts and the same process installation situation, there are generally two ways to install the end:
1. At the end of the main pipe loop and 3 pipes in the same way
When the main engine adopts the three-pipe method of the main line on the same route, the main pipe at the end needs to adopt the ring plus three pipes in the same route accordingly. As shown in Figure 4, the host is on the same route. At level crossings, there is a set of main lines at each corridor crossing, so the three corridor crossings must also travel the same way.


1. At the end of the main pipe loop and 3 pipes in the same way

A set of main line, including the water inlet and the backwater. After the main line reaches the end, the three ends will also be on the same route. If the same route is not done, the water flow at the entrance of the upper corridor will be large, while the water flow at the entrance of the lower corridor will be small. . The principle of the same process at the end is the same as the principle of the same process with the main engine, and it is necessary to ensure that the flow of water in and return at each end is the same length.
2. The end main pipe loops in the same way
Correspondingly, when there are a large number of hosts, the same route installation is selected for the main line loop mode, so that each fluid has the same length through the end, and the installation principle is the same as that of the host loop installation.

The end main pipe loops in the same way


As shown in Figure 5, for the heating of a three-story building, first of all, it is necessary to ensure that the distance of the fluid to each corridor entrance is the same. When the stairs reach the corridor entrance, they reach each heating user's home through the water divider on the outside of the corridor. The pipelines are installed in the same way. .
And each user’s home also has a water separator, that is, the room water separator inside the corridor. The heating pipes at the end of each room that reach the user’s home through the water separator also need to be installed in the same process. Then, the entire system forms a circular process, and the fluid not only has the same distance to each household, but also has the same distance to each room of the user.
Therefore, even if there are more floors and the number of heating users, the installation method of the same route in the ring can ensure that the heating effect of each user is equivalent. Of course, due to the different heating terminal styles of users, the difference between the room's heat preservation effect and the user's usage may lead to certain differences in the heating effect.

AQUA case

4. The initial investment of Tongcheng installation is high, but the advantages are obvious
Large-scale hot water or heating projects are installed in the same process. Due to the increase in the length of pipelines and the increase in accessories such as water separators, control valves, and pressure gauges, the initial investment cost of installation has increased a lot compared with remote installation. With the return pipe, the length of the pipe increases and the water resistance increases, which increases the energy consumption of the water pump, but the effect of its later operation is obvious.
First of all, the water flow of each device in the same process installation is even, the distribution of cold and heat is even, the front end of the circulation system is the same as the back end, for the end, there will be no front end heat (cold) and back end cold (hot) phenomena. , To ensure the user's experience; for the heat pump unit, there will be no small temperature difference between the front-end unit and large temperature difference between the back-end units, so as to ensure that the unit is balanced and working normally.
Secondly, the same process installation is convenient for equipment maintenance, and closing any equipment will not affect the overall cycle. If a certain equipment fails during operation, the waterway valves on both sides of the equipment can be closed for maintenance during system operation. Will affect the overall operation.
Copyright: Wang Yanming, a technical businessman

20 years of brand strength , Professional technical team, The product meets the standard, At your service

Related articles

  • 020-32583997
主站蜘蛛池模板: 少妇人妻上班偷人精品视频 | 中文精品一区二区三区四区 | 午夜精品久久久久久久第一页按摩 | 国产www精品| 99精品欧美一区二区三区综合在线 | 亚洲精品无码不卡在线播放 | 成人在线免费观看视频 | 色欲av无码一区二区三区 | 中文字幕人妻被公上司喝醉506 | 手机国产丰满乱子伦免费视频 | 狠狠噜天天噜日日噜色综合 | 精品无人乱码高清在线观看 | 秋霞国产成人精品午夜视频app | 亚洲成人免费在线 | 久久精品国产三级 | 免费av在线播放 | 久久精品久久久久 | 六月丁香在线视频 | 人人妻人人澡人人爽人人精品浪潮 | 国产最新在线视频 | 草草地址线路①屁屁影院成人 | 国产精品999在线观看 | 性综合网 | 国产日韩久久久 | 夜夜爽8888天天躁夜夜躁狠狠 | 国产精品自产拍在线观看免费 | 亚洲图片另类图片激情动图 | 竹菊影视欧美日韩一区二区三区四区五区 | 成人精品在线 | 亚洲 日韩 欧美 有码 在线 | 欧洲熟妇色xxxx欧美老妇性 | 高潮喷吹一区二区在线观看 | 日韩精品一二三四区 | 国产精品视频999 | 影音先锋男人天堂 | 国产一本二卡三卡四卡乱码 | 中文字幕在线观看亚洲日韩 | 日本xxxx片免费观看 | 免费精品国产人妻国语色戒 | 亚洲成熟毛多妇女av毛片 | 在线看成人 | 欧美 日韩 中文字幕 | 亚洲黄色a | 亚洲欧美日韩国产国产a | 黄色小网站在线观看 | 97插插插| 午夜精品久久久久久久久久久 | 2020久久天天躁狠狠躁夜夜 | 国产女爽爽精品视频天美传媒 | 爽爽窝窝午夜精品一区二区 | 1000部又爽又黄无遮挡的视频 | 精品无码久久久久国产动漫3d | 五月丁香六月综合缴清无码 | 中文字幕av不卡 | a∨变态另类天堂无码专区 中文字字幕在线乱码视频 婷婷成人综合激情在线视频播放 | 亚洲精品911 | 一本一道av无码中文字幕麻豆 | 又黄又爽又色的网站 | 黄色在线播放网站 | 日韩av无码一区二区三区无码 | 日韩欧美一 | 91资源在线视频 | 亚洲国产成人精品无码区在线 | 成人在线观看av | 激情高潮呻吟抽搐喷水 | 极品美女扒开粉嫩小泬图片 | 中文字幕av无码一二三区电影 | 亚洲第一成年人网站 | 中文字幕无码日韩中文字幕 | 精品国产福利久久久 | 国产在线拍揄自揄视频导航 | 成人午夜亚洲精品无码网站 | 国产精品自拍网站 | 久久国产精品免费一区 | 中字无码av电影在线观看网站 | 久久精品九九热无码免贵 | 日韩1区2区3区 | 性av免费 | 古装做爰无遮挡三级 | 激情综合亚洲色婷婷五月 | www.波多野结衣.com | 天干天干夜啦天干天干国产 | 亚洲伊人久久综合网站 | 亚洲一区二区av在线观看 | 亚洲精品水蜜桃 | 亚洲精品久久久久久动漫 | 91成人在线观看喷潮动漫 | 尹人香蕉久久99天天拍 | 成人av毛片无码免费网站 | 成人女人看片免费视频放人 | 草裙社区精品视频三区免费看 | 97夜夜澡人人爽人人喊91洗澡 | 日韩专区中文字幕 | 白浆网站 | 国产亚洲性欧美日韩在线观看软件 | 国产玉足榨精视频在线观看 | 色综合a怡红院怡红院 | 182av| 欧美精品另类 | 主站蜘蛛池模板: 成人免费毛片片v | 婷婷五月六月综合缴情 | 国产亚洲熟妇综合视频 | 国产亚洲产品影市在线产品 | 国产欧美日韩免费看aⅴ视频 | 亚洲欧美不卡视频在线播放 | 一区二区三区在线 | 日 | 亚洲区偷拍| 日韩精品无码专区免费视频 | 国产精品美脚玉足脚交 | 人妻少妇偷人无码精品av | 国产精品s | 999国产精品视频免费 | 欧美 日韩 国产 另类 图片区 | 视频在线看 | 一本无码av中文出轨人妻 | 路边理发店露脸熟妇泻火 | 国产精品婷婷久久爽一下 | 一区二区麻豆 | 8090成人午夜精品无码 | 黄色片不卡 | av国産精品毛片一区二区三区 | 国产成人无码av在线播放dvd | 国产极品美女到高潮无套 | 午夜偷拍福利 | 激情爆乳一区二区三区 | 亚洲人成无码网站久久99热国产 | 激情小说av| 亚洲第一在线 | 亚洲国产成人久久综合下载 | 久久综合九色综合欧洲98 | 色视频在线播放 | 欧美视频在线观看一区二区 | 免费精品国产自产拍在线观看 | 国产a一级 | 亚洲免费黄色网址 | www.中文字幕在线观看 | 国产成年无码久久久久毛片 | 国产综合视频在线观看 | 免费一级特黄特色大片 | 伊人老司机 | 欧美高清性xxxxhd | 毛片aaa| 成人免费视频一区 | 99久在线国内在线播放免费观看 | 宅男噜噜噜66在线观看 | 国产无毛片| 桃色在线视频 | 一级视频在线播放 | 精品人妻人人做人人爽夜夜爽 | 成人在线一区二区三区 | 玩弄放荡丰满少妇视频 | 日本强伦姧人妻久久影片 | 精品国内自产拍在线播放观看 | 亚洲成aⅴ人在线电影 | 无码av不卡一区二区三区 | 国产精品视频免费看 | 主人性调教le百合sm | 黄色一级片在线 | 77777亚洲午夜久久多喷 | 看免费黄色片 | 中文字幕第三页 | 四虎影视永久免费观看 | 久久香蕉国产线看观看亚洲小说 | 奇米影视777四色 | 国内精品自国内精品自线 | 亚洲精品国产精品乱码不卞 | 久久精品人人槡人妻人人玩av | 在线免费观看a级片 | 91福利免费 | 玖玖爱这里只有精品视频 | 久久久久久久久久久97 | 一区二区三区日韩 | 最新中文乱码字字幕在线 | 亚洲日韩乱码久久久久久 | 中文字幕日韩第一页 | 亚洲中字慕日产2020 | 夜夜香夜夜摸夜夜添视频 | 西西人体大胆尺度写真 | 国产黄网永久免费视频大全 | 美国一级黄色大片 | 精品福利一区二区三区免费视频 | 欧美人成网站在线看 | av网站大全在线观看 | av在线播放网| 强被迫伦姧高潮无码bd电影 | 日日操夜夜爽 | 久久伊人av | 精品无人区麻豆乱码1区2区 | 麻豆国产av尤物网站尤物 | 中文字幕日韩精品无码内射 | 国产有码 | 亚洲乱码一卡二卡四卡乱码新区 | 国产午夜视频在线 | 亚洲色在线v中文字幕 | 久久精品成人免费观看三 | 国产大尺度在线 | 欧美成人免费在线视频 | 中文字幕乱码在线 | 主站蜘蛛池模板: 国自产拍偷拍精品啪啪 | 亚洲性图视频 | 亚洲最大激情中文字幕 | 超碰99在线 | 揉着我的奶从后面进去视频 | 国产精品内射视频免费 | 午夜福利1000集在线观看 | 国产黄网永久免费视频大全 | av在线播放网址 | 四虎av | 久久无码高潮喷水免费看 | 美女裸体视频永久免费 | 欧美人与物videos另类xxxxx | 最近中文字幕在线观看视频 | 男女免费观看做爰视频在线观看 | 亚洲av毛片| 国产无套露脸在线观看 | 五月天六月婷婷 | 日本人妻换人妻毛片 | 亚洲一区二区免费看 | 超碰青草 | 大学生疯狂高潮呻吟免费视频 | 精品欧美乱码久久久久久1区2区 | 色综合色综合色综合色欲 | 国产无人区卡一卡二卡乱码 | 亚洲色大成网站www久久九 | 久久久久久一区二区三区 | 精品国产乱码久久久久久蜜退臀 | 亚洲精选中文字幕 | 手机在线观看免费av | 欧美在线专区 | 小小拗女性bbwxxxx国产 | www插插插无码免费视频网站 | 国产视频在线观看一区二区 | 亚洲日产韩国一二三四区 | 久久久精品成人免费观看 | 性色av一区二区三区人妻 | 特级黄色一级片 | 国产黄a| √最新版天堂资源在线 | aⅴ免费视频在线观看 | 欧美z0zo人禽交另类视频 | 亚洲乱码1卡2卡3乱码在线芒果 | 伊人天天久大香线蕉av色 | 可以看av的网址 | 熟女人妻aⅴ一区二区三区麻豆 | 激情午夜网 | 亚洲精品久久久久58 | 亚洲影视在线 | 亚洲男人综合久久综合天堂 | 狠狠cao日日穞夜夜穞av | 欧美三级色图 | 秋霞在线观看片无码免费不卡 | 岛国无码av不卡一区二区 | 精品国产这么小也不放过 | 国产成人综合野草 | 欧美30p| www.猫咪av| 亚洲第七页| 亚洲巨乳自拍在线视频 | 特黄特色大片免费播放 | 日本三级理论久久人妻电影 | 99久久一区二区 | 99热在线播放 | 香蕉久久久久久av综合网成人 | 亚洲综合久久久久久888 | 久久午夜无码鲁丝片直播午夜精品 | 国产日韩欧美亚洲精品中字 | 日韩av无码中文一区二区三区 | 精品久久久久久一区二区里番 | 国产a网 | 黄色的一级片 | 99热门精品一区二区三区无码 | 日本三级成本人网站 | 亚洲射图 | 久久大香伊蕉在人线观看热 | 亚洲性久久 | 日韩在线视频精品 | 亚洲乱码日产精品bd在 | 亚洲图片一区二区三区 | 人妻精品丝袜一区二区无码av | 亚洲精品久 | 亚洲国产成人一区二区精品区 | 亚洲成av人片在线观看天堂无码 | 国产毛片毛片毛片毛片 | 亚洲精品无码一区二区 | 国产精品一区二区久久不卡 | 久月婷婷| 久久成人国产精品 | 人成午夜免费大片 | 无码人妻精品一区二区三区下载 | 国产网红女主播精品视频 | 欧美日韩国产在线人成 | 久久久日韩精品一区二区三区 | 日本婷婷| 久久99国产精品久久99软件 | 久久精品美女视频 | 日韩免费无码一区二区视频 | 色老头一区二区三区在线观看 |