中国熟妇牲交视频-日本高清视频在线www色-欧美日韩精品在线-成人国产一区二区三区精品麻豆-强奷妇系列中文字幕-天堂…中文在线最新版在线-丰满少妇一级-国产有码-精品亚洲a∨无码一区二区三区-伊人久久综合色-欧美日韩国产专区-婷婷久-激情小说综合-精品少妇av一区二区三区-制服丝袜天堂-www国产-巨胸爆乳美女露双奶头挤奶-欧美性猛交xxxx免费视频软件-亚洲成av人片一区二区梦乃-无码国产一区二区免费

EN中文English
020-32583997
13825089207

Is there an imbalance in the amount of water and heat in a large-scale hot water project? Pictures and texts teach you design and installation!

Release date:2021-04-01

Are you still worrying about swimming pool filtration, disinfection and other issues? Click for free consultation and answer your questions one-on-one.

According to many dealers, when doing large-scale hot water or heating projects, uneven flow and heat distribution often occur. Due to the continuous maturity of air energy products and technological advancement, the performance of the unit will not have major shortcomings. Under the premise of reasonable selection of the unit, the uneven distribution of the end heat source is likely to be caused by improper system design during the installation process. The same process installation can avoid this phenomenon.


AQUA case


1. Simultaneous installation is the best way of hydraulic balance
In general, small-scale engineering dealers use remote installations to facilitate installation and save costs. Due to the short length of the pipeline, the difference between each end is not very obvious, so its shortcomings are also ignored. However, there are also some dealers who install flow regulators on each parallel branch for control.
The same process means that the path length of the fluid passing through each device is equal and the resistance is the same. This is also very difficult to understand, because you have to paint by yourself during the actual operation, so it is quite troublesome.
The length of the pipe passing through each parallel loop is basically the same. If the resistance loss through each meter of pipe is nearly equal, the resistance of the pipe network can be kept balanced without adjustment. The same process system can ensure that the water flow through each end is uniform, and prevent insufficient water flow at the remote end to affect the cooling or heating effect. The same process installation is very common in large-scale air-conditioning and refrigeration projects. Because the principles of heat pumps and air-conditioning are similar, they are gradually adopted by some air energy distributors. After continuous testing, they are widely used in large-scale air energy hot water and heating projects.
Taking heating as an example, the backwater of the first group of radiators at the front does not circulate to the main pipe temporarily, but continues to go down through the extension of the pipe, connecting the return pipe of the next group of radiators, and so on, from the end The radiator pulls out a return pipe and returns to the return pipe of the main pipe.
The water flow of each group of radiators in the system is basically the same. The system is very balanced. Generally, there will be no insufficient heat or no heat at the end of the system. It can be said that it is a way to balance the best hydraulic system.


Simultaneous installation is the best way of hydraulic balance

As shown in Figure 1, there are three hosts. Many people install them in this way, but there will be problems with more than five. Just imagine where the water flow is where the resistance is small and where the pipe diameter is short, then it flows there. Uneven distribution will occur. There will be more water flow on the right side, and less and less water flow to the left. This will also cause the temperature difference on the right side to be small. The more the temperature difference is to the left, the greater the temperature difference. Not the same journey.


AQUA case


2. There are many detailed requirements for the host installation in the same process
In order to avoid uneven distribution of the heat source at the end, the same process should be used when installing two or more units in parallel. For the same process, the path length of the fluid through each device must be equal and the resistance must be the same. According to the number of units, there are generally two ways for the host in the same journey:
1. The way of 3 pipes for main road:


Supervisory road 3 tube way
As shown in Figure 2, the rectangle in the figure represents the heat pump host, and the circle represents the circulating water pump.
After the fluid comes out of the water pump, it enters the heat pump host in three ways. Because the lengths of the water inlet pipes of the three hosts are inconsistent, there should be differences in the water outlet pipes, so that the path length of the fluid through each device is equal.
For example, the hosts are arranged in parallel. The inlet pipe of the first host is 3 meters, the second inlet is 4 meters, and the third inlet is 5 meters. If the first outlet is 8 meters, then the second The water outlet pipe of the main engine is 7 meters, and the water outlet pipe of the third main engine is 6 meters, so that the path length of the fluid through each device is 11 meters.


2. Main road ring way


2. Main road ring way

As shown in Figure 3, the rectangle in the figure represents the heat pump host, and the circle represents the circulating water pump: 1 is a circulating water pump (2 units); 2 is a 25P heat pump unit; 3 is a strong electric control cabinet (distribution cabinet); 4 is Weak current control cabinet; 5 is the main water inlet pipe (on the bottom); 6 is the main water outlet pipe (on the top).
There are 5 main engines. Large engineering water pumps need one for one use and one for preparation. After the fluid comes in, it should not pass through the first device first, go to the end first, and then come back. The path lengths of all the devices are the same.
In order to improve the overall efficiency and service life of the system, improve the customer's experience, and at the same time facilitate daily maintenance, the following aspects need to be paid attention to during the installation of the host in the same process
①The side of the unit's own electric control box and the power distribution cabinet are in the front for maintenance; ②The three main inlet and outlet pipes are behind the groups, two inlet pipes are below, and the outlet pipes are on the top; The distance between the pump center is 1.2 meters; ③The center of the water pump is 1.5 meters away from the side panel of the unit; the power distribution cabinet and the weak current cabinet are installed in the middle of the N units, in the same straight line with the front panel of the unit, and the bottom edge is 1.5 meters from the ground. The distance between the unit and the unit should not affect the maintenance of the machine. Each control cabinet can control up to 10 units. For projects with more than 10 units, the control cabinet should be added and the unit control number should be evenly distributed; the interface between the unit and the pump must be installed with a soft Connect to reduce noise and facilitate installation and maintenance; ④For installations on the ground, the unit support should be installed on the concrete foundation, and the concrete foundation platform should be provided with drainage ditch; for installations on the roof, the unit support should be stressed. The waterproof insulation layer should not be damaged; ⑤ Rubber shock-absorbing pads should be installed between the unit and the water pump and the fixed bracket.


AQUA case


Three, the end of the same process and the host at the same time
The terminal equipment of a large-scale hot water or heating project is generally a radiator or fan coil or floor heating. When the host is installed in the same process, only the end can be installed in the same process to ensure the uniform output of the end.
According to the number of hosts and the same process installation situation, there are generally two ways to install the end:
1. At the end of the main pipe loop and 3 pipes in the same way
When the main engine adopts the three-pipe method of the main line on the same route, the main pipe at the end needs to adopt the ring plus three pipes in the same route accordingly. As shown in Figure 4, the host is on the same route. At level crossings, there is a set of main lines at each corridor crossing, so the three corridor crossings must also travel the same way.


1. At the end of the main pipe loop and 3 pipes in the same way

A set of main line, including the water inlet and the backwater. After the main line reaches the end, the three ends will also be on the same route. If the same route is not done, the water flow at the entrance of the upper corridor will be large, while the water flow at the entrance of the lower corridor will be small. . The principle of the same process at the end is the same as the principle of the same process with the main engine, and it is necessary to ensure that the flow of water in and return at each end is the same length.
2. The end main pipe loops in the same way
Correspondingly, when there are a large number of hosts, the same route installation is selected for the main line loop mode, so that each fluid has the same length through the end, and the installation principle is the same as that of the host loop installation.

The end main pipe loops in the same way


As shown in Figure 5, for the heating of a three-story building, first of all, it is necessary to ensure that the distance of the fluid to each corridor entrance is the same. When the stairs reach the corridor entrance, they reach each heating user's home through the water divider on the outside of the corridor. The pipelines are installed in the same way. .
And each user’s home also has a water separator, that is, the room water separator inside the corridor. The heating pipes at the end of each room that reach the user’s home through the water separator also need to be installed in the same process. Then, the entire system forms a circular process, and the fluid not only has the same distance to each household, but also has the same distance to each room of the user.
Therefore, even if there are more floors and the number of heating users, the installation method of the same route in the ring can ensure that the heating effect of each user is equivalent. Of course, due to the different heating terminal styles of users, the difference between the room's heat preservation effect and the user's usage may lead to certain differences in the heating effect.

AQUA case

4. The initial investment of Tongcheng installation is high, but the advantages are obvious
Large-scale hot water or heating projects are installed in the same process. Due to the increase in the length of pipelines and the increase in accessories such as water separators, control valves, and pressure gauges, the initial investment cost of installation has increased a lot compared with remote installation. With the return pipe, the length of the pipe increases and the water resistance increases, which increases the energy consumption of the water pump, but the effect of its later operation is obvious.
First of all, the water flow of each device in the same process installation is even, the distribution of cold and heat is even, the front end of the circulation system is the same as the back end, for the end, there will be no front end heat (cold) and back end cold (hot) phenomena. , To ensure the user's experience; for the heat pump unit, there will be no small temperature difference between the front-end unit and large temperature difference between the back-end units, so as to ensure that the unit is balanced and working normally.
Secondly, the same process installation is convenient for equipment maintenance, and closing any equipment will not affect the overall cycle. If a certain equipment fails during operation, the waterway valves on both sides of the equipment can be closed for maintenance during system operation. Will affect the overall operation.
Copyright: Wang Yanming, a technical businessman

20 years of brand strength , Professional technical team, The product meets the standard, At your service

Related articles

  • 020-32583997
主站蜘蛛池模板: 国产精品偷伦视频观看免费 | 叼嘿视频91 | 亚洲欧美人高清精品a∨ | 欧美大片免费观看 | 少妇人妻偷人激情视频 | 911看片| 日本强伦姧人妻69影院 | 黄色一级免费看 | 欧美男人天堂 | 亚洲一级黄色大片 | 国产亚洲精品久久久久动 | 中文字幕av无码一区二区三区 | 日韩一级久久 | 一区二区三区日韩在线 | 人妻无码第一区二区三区 | 自拍偷拍亚洲欧洲 | 欧洲-级毛片内射 | 深夜网站在线观看 | 国产成人精品无缓存在线播放 | 亚洲综合精品成人 | 日韩在线三级 | 国产精品怡红院永久免费 | 粗喘呻吟撞击猛烈疯狂 | 色欲综合视频天天天综合网站 | 久久久久女教师免费一区 | www.欧美色| 亚洲日韩va无码中文字幕 | 伊人网在线观看 | 亚洲精品高潮呻吟久久av | 精品一区二区三区在线观看 | 亚洲va无码手机在线电影 | 吃奶摸下激烈床震视频试看 | 午夜dv内射一区区 | 国产精品偷啪在线观看 | 人人干人人干 | 九九久久99综合一区二区 | 午夜草逼 | 人妻av无码系列一区二区三区 | 国产强被迫伦姧在线观看无码 | 日本少妇毛茸茸高潮 | 四川50岁熟妇大白屁股真爽 | 日韩欧美亚洲国产精品字幕久久久 | 三个男人躁我一个爽视频免费 | 婷婷色小说 | 本道久久综合无码中文字幕 | 国产精品久久99 | 亚洲精品国产首次亮相 | 99久久99久久精品免费观看 | 欧美激情亚洲 | 日本欧美激情 | 四虎永久在线精品 | 国产美女精品视频线播放 | www.xxxx国产 | 一本大道久久香蕉成人网 | 一区二区三区亚洲精品国 | 国产suv精品一区二av18款 | 99久久国产露脸精品 | 亚洲综合另类小说色区色噜噜 | 无码专区手机在线播放 | av无码欧洲亚洲电影网 | 四库影院永久国产精品 | 99视频久久 | 日韩成人av片 | 中文无码高潮到痉挛在线视频 | 99热9| 无码人妻一区二区三区免费看 | 九九热只有精品 | 日韩无套无码精品 | 荫蒂被男人添的好舒服爽免费视频 | 国产精品爱久久久久久久电影蜜臀 | 激情文学8888 | 四虎亚洲精品高清在线观看 | 黄色污污视频网站 | 午夜av网| 又大又硬又黄的免费视频 | 奇米亚洲| 亚洲精品在看在线观看高清 | 又色又爽又黄高潮的免费视频 | 人人爽久久久噜噜噜婷婷 | 超碰人人模人人爽人人喊手机版 | 国产精品xxxx | 禁断介护一区二区在线 | 国产啪精品视频网站免费 | 亚洲日本高清成人aⅴ片 | 国产精品人人妻人人爽人人牛 | 爆乳高潮喷水无码正在播放 | 日韩无码在钱中文字幕在钱视频 | 亚洲色视频 | 星空大象在线观看免费高清 | 男人的天堂在线视频 | 成人国产精品??电影 | 激情婷婷小说 | 国产欧美另类久久久精品图片 | 免费看黄色片视频 | 少妇愉情理伦片高潮日本 | 亚洲熟妇中文字幕日产无码 | 五十路亲子中出在线观看 | 成av人电影在线观看 | 国产精品久久久久久爽爽爽床戏 | 主站蜘蛛池模板: 蜜桃91丨九色丨蝌蚪91桃色 | 亚洲免费在线视频 | 国产亚洲精品电影网站在线观看 | 日韩国产图片区视频一区 | 欧美亚洲国产日韩 | 亚洲性人人天天夜夜摸 | 国产精品午夜爆乳美女视频 | 777色婷婷视频二三区 | 四色网址 | 伊甸园精品区 | 中国无码人妻丰满熟妇啪啪软件 | 污污内射在线观看一区二区少妇 | 91免费观看视频在线 | 亚洲视频综合在线 | 亚洲欧美不卡视频在线播放 | 欧美精品一区二区三区久久久竹菊 | 先锋影音一区二区三区 | 国产精品午夜福利不卡 | 人妻精品人妻无码一区二区三区 | 99久久国产亚洲高清观看 | 精品国产999久久久免费 | 人妻激情另类乱人伦人妻 | 精品少妇爆乳无码aⅴ区 | 免费看撕开奶罩揉吮奶头视频 | 午夜理论片yy44880影院 | 免费无码高潮流白浆视频 | 极品探花在线 | 自拍偷自拍亚洲精品牛影院 | 又粗又大又黄又硬又爽免费看 | 2020国产在线拍揄自揄视频 | 亚洲成人二区 | 性欧美在线观看 | 欧美第二页 | 亚洲日本中文字幕乱码在线电影 | 成年人久久| 极品人妻被黑人中出种子 | 一级片免费观看视频 | 免费观看一级黄色片 | 青青久在线视频 | 欧洲精品码一区二区三区 | 成人毛片基地 | 亚洲欧美日韩综合在线丁香 | 在线观看亚洲区 | 久久久噜噜噜久久久精品 | 日韩欧美激情视频 | 国产不卡av在线播放 | 亚洲 欧美 动漫 少妇 自拍 | 中文字幕无码精品亚洲资源网久久 | 国产精品免费久久 | 2019久久久高清456 | 国产欧美va天堂在线观看视频 | 国产妇女馒头高清泬20p多毛 | 无码av免费毛片一区二区 | 日韩av一二三 | 91免费短视频 | 久久亚洲区 | 在线观看av中文字幕 | 欲色影音 | 国v精品久久久网 | 中国精品18videosex性中国 | 欧美亚洲国产一区 | 亚洲男人的天堂网站 | 人妻少妇久久精品电影 | 亚洲国产成人久久综合电影 | 天天躁日日躁狠狠躁婷婷高清 | 91精品国产综合久久婷婷香蕉 | 国产精品久久久久久久福利 | 国产尤物精品福利视频 | 精品第一国产综合精品aⅴ 热99re6久精品国产首页 | 鲁啊鲁在线视频 | 最新99热| 欧美中文字幕在线观看 | 国产成人精品无码免费看夜聊软件 | 无码精品a∨在线观看十八禁软件 | 国产亚洲精品码 | 精品一区二区的区别 | 成年女性特黄午夜视频免费看 | 欧美巨大黑人极品精男 | 草裙社区精品视频播放 | 国产又爽又黄又爽又刺激 | 91操视频| 中文字幕精品亚洲无线码一区应用 | 国产美女极度色诱视频www | 精品无码av一区二区三区不卡 | 国产日韩欧美 | 3d动漫精品啪啪一区二区竹菊 | 亚洲欧洲视频在线观看 | 欧美熟妇丰满xxxxx裸体艺术 | 久久久无码人妻精品无码 | 17草在线 | 天堂网在线观看 | 国产熟妇另类久久久久久 | 男女一进一出超猛烈的视频 | 国产99视频在线 | 欧美有码在线 | 亚洲国产av无码综合原创国产 | 激情网站免费 | 精品国产一区二区av麻豆不卡 | 成人精品动漫一区二区 | 主站蜘蛛池模板: 久久久噜噜噜久久久精品 | 亚洲国产精品无码中文字2022 | 一本色道久久综合亚州精品蜜桃 | 精品无人乱码高清在线观看 | 国产精品边做奶水狂喷无码 | 久久午夜夜伦鲁鲁片免费无码影视 | 欧美交换配乱吟粗大视频 | 成本人h无码播放私人影院 一二三不卡 | 性高湖久久久久久久久 | 狠狠亚洲婷婷综合色香五月 | 亚洲精品一区二区在线观看 | 亚洲精品乱码久久久久红杏 | 人妻少妇久久中文字幕456 | 欧美伦理影院 | 国产第一页在线播放 | 全部露出来毛走秀福利视频 | 中文字幕日韩欧美一区二区三区 | 成人av高清在线观看 | 国产精品美女乱子伦高潮 | 99久久婷婷国产综合精品青草免费 | 醉酒后少妇被疯狂内射视频 | 国产最新av在线播放不卡 | 亚洲第一视频在线 | 国产区91| 少妇人妻互换不带套 | 亚洲尹人 | 亚洲精品在线视频观看 | 国产精品免费久久久久影院仙踪林 | 欧美福利网 | m3u8成人免费视频 | 无码人妻少妇久久中文字幕蜜桃 | 少妇粉嫩小泬喷水视频 | 毛片黄色一级 | 久久99精品久久久久久久不卡 | 精品无码国产自产拍在线观看蜜 | 麻豆av久久av盛宴av | 亚洲麻豆一区二区三区 | 91av免费观看 | 国产第一色| 女同av在线| 欧美黄视频 | 99久久re免费热在线 | 精品国产aⅴ麻豆 | 91一区二区在线 | 91免费在线播放 | 自拍中文字幕 | 99久久99| 久久精品久久精品中文字幕 | 欧美日韩免费做爰大片人 | 国产成人精品在线 | 国产一区二区三区视频在线观看 | 欧美一区二区三区四区视频 | 午夜伦情电午夜伦情电影 | 日韩午夜理论免费tv影院 | 啪啪五月天 | 另类 专区 欧美 制服丝袜 | 人人妻人人澡人人爽人人精品浪潮 | 欧美精品二区三区 | 精品久久香蕉国产线看观看亚洲 | 综合三区后入内射国产馆 | 国产模特嫩模私拍视频在线 | 五月激情婷婷网 | 国产三级在线观看完整版 | 亚洲欧洲av在线 | 欧美五月激情 | 午夜寂寞少妇aaa片毛片 | 免费人成网站视频在线观看 | 久久国产午夜精品理论片 | 欧美色图19p | 少妇人妻久久无码专区 | 国产三级精品三级 | 综合色网站 | 日本xxxx片免费观看 | av制服丝袜白丝国产网站 | 中文字幕人成乱码在线观看 | 中文字幕免费高清网站 | 天堂免费在线视频 | 亚洲涩情 | 香蕉黄色网 | 女教师高潮黄又色视频 | 国产高清国产精品国产专区 | 日韩欧美亚洲一区二区三区 | 先锋影音中文字幕 | 69天堂人成无码麻豆免费视频 | av乱码 | 毛片大全免费 | 国产精品久久久久久久模特人妻 | 国产成人av乱码免费观看 | 国产片网站 | 一二三区视频在线观看 | 色呦呦一区 | 日本在线免费看 | 成人激情免费视频 | 色播基地 | 亚洲精品无码高潮喷水a片软 | 亚洲精品欧美精品 | 国产精品久久久久久亚洲调教 | av永久天堂一区二区三区 | 97精品国产 |