中国熟妇牲交视频-日本高清视频在线www色-欧美日韩精品在线-成人国产一区二区三区精品麻豆-强奷妇系列中文字幕-天堂…中文在线最新版在线-丰满少妇一级-国产有码-精品亚洲a∨无码一区二区三区-伊人久久综合色-欧美日韩国产专区-婷婷久-激情小说综合-精品少妇av一区二区三区-制服丝袜天堂-www国产-巨胸爆乳美女露双奶头挤奶-欧美性猛交xxxx免费视频软件-亚洲成av人片一区二区梦乃-无码国产一区二区免费

EN中文English
020-32583997
13825089207

Is there an imbalance in the amount of water and heat in a large-scale hot water project? Pictures and texts teach you design and installation!

Release date:2021-04-01

Are you still worrying about swimming pool filtration, disinfection and other issues? Click for free consultation and answer your questions one-on-one.

According to many dealers, when doing large-scale hot water or heating projects, uneven flow and heat distribution often occur. Due to the continuous maturity of air energy products and technological advancement, the performance of the unit will not have major shortcomings. Under the premise of reasonable selection of the unit, the uneven distribution of the end heat source is likely to be caused by improper system design during the installation process. The same process installation can avoid this phenomenon.


AQUA case


1. Simultaneous installation is the best way of hydraulic balance
In general, small-scale engineering dealers use remote installations to facilitate installation and save costs. Due to the short length of the pipeline, the difference between each end is not very obvious, so its shortcomings are also ignored. However, there are also some dealers who install flow regulators on each parallel branch for control.
The same process means that the path length of the fluid passing through each device is equal and the resistance is the same. This is also very difficult to understand, because you have to paint by yourself during the actual operation, so it is quite troublesome.
The length of the pipe passing through each parallel loop is basically the same. If the resistance loss through each meter of pipe is nearly equal, the resistance of the pipe network can be kept balanced without adjustment. The same process system can ensure that the water flow through each end is uniform, and prevent insufficient water flow at the remote end to affect the cooling or heating effect. The same process installation is very common in large-scale air-conditioning and refrigeration projects. Because the principles of heat pumps and air-conditioning are similar, they are gradually adopted by some air energy distributors. After continuous testing, they are widely used in large-scale air energy hot water and heating projects.
Taking heating as an example, the backwater of the first group of radiators at the front does not circulate to the main pipe temporarily, but continues to go down through the extension of the pipe, connecting the return pipe of the next group of radiators, and so on, from the end The radiator pulls out a return pipe and returns to the return pipe of the main pipe.
The water flow of each group of radiators in the system is basically the same. The system is very balanced. Generally, there will be no insufficient heat or no heat at the end of the system. It can be said that it is a way to balance the best hydraulic system.


Simultaneous installation is the best way of hydraulic balance

As shown in Figure 1, there are three hosts. Many people install them in this way, but there will be problems with more than five. Just imagine where the water flow is where the resistance is small and where the pipe diameter is short, then it flows there. Uneven distribution will occur. There will be more water flow on the right side, and less and less water flow to the left. This will also cause the temperature difference on the right side to be small. The more the temperature difference is to the left, the greater the temperature difference. Not the same journey.


AQUA case


2. There are many detailed requirements for the host installation in the same process
In order to avoid uneven distribution of the heat source at the end, the same process should be used when installing two or more units in parallel. For the same process, the path length of the fluid through each device must be equal and the resistance must be the same. According to the number of units, there are generally two ways for the host in the same journey:
1. The way of 3 pipes for main road:


Supervisory road 3 tube way
As shown in Figure 2, the rectangle in the figure represents the heat pump host, and the circle represents the circulating water pump.
After the fluid comes out of the water pump, it enters the heat pump host in three ways. Because the lengths of the water inlet pipes of the three hosts are inconsistent, there should be differences in the water outlet pipes, so that the path length of the fluid through each device is equal.
For example, the hosts are arranged in parallel. The inlet pipe of the first host is 3 meters, the second inlet is 4 meters, and the third inlet is 5 meters. If the first outlet is 8 meters, then the second The water outlet pipe of the main engine is 7 meters, and the water outlet pipe of the third main engine is 6 meters, so that the path length of the fluid through each device is 11 meters.


2. Main road ring way


2. Main road ring way

As shown in Figure 3, the rectangle in the figure represents the heat pump host, and the circle represents the circulating water pump: 1 is a circulating water pump (2 units); 2 is a 25P heat pump unit; 3 is a strong electric control cabinet (distribution cabinet); 4 is Weak current control cabinet; 5 is the main water inlet pipe (on the bottom); 6 is the main water outlet pipe (on the top).
There are 5 main engines. Large engineering water pumps need one for one use and one for preparation. After the fluid comes in, it should not pass through the first device first, go to the end first, and then come back. The path lengths of all the devices are the same.
In order to improve the overall efficiency and service life of the system, improve the customer's experience, and at the same time facilitate daily maintenance, the following aspects need to be paid attention to during the installation of the host in the same process
①The side of the unit's own electric control box and the power distribution cabinet are in the front for maintenance; ②The three main inlet and outlet pipes are behind the groups, two inlet pipes are below, and the outlet pipes are on the top; The distance between the pump center is 1.2 meters; ③The center of the water pump is 1.5 meters away from the side panel of the unit; the power distribution cabinet and the weak current cabinet are installed in the middle of the N units, in the same straight line with the front panel of the unit, and the bottom edge is 1.5 meters from the ground. The distance between the unit and the unit should not affect the maintenance of the machine. Each control cabinet can control up to 10 units. For projects with more than 10 units, the control cabinet should be added and the unit control number should be evenly distributed; the interface between the unit and the pump must be installed with a soft Connect to reduce noise and facilitate installation and maintenance; ④For installations on the ground, the unit support should be installed on the concrete foundation, and the concrete foundation platform should be provided with drainage ditch; for installations on the roof, the unit support should be stressed. The waterproof insulation layer should not be damaged; ⑤ Rubber shock-absorbing pads should be installed between the unit and the water pump and the fixed bracket.


AQUA case


Three, the end of the same process and the host at the same time
The terminal equipment of a large-scale hot water or heating project is generally a radiator or fan coil or floor heating. When the host is installed in the same process, only the end can be installed in the same process to ensure the uniform output of the end.
According to the number of hosts and the same process installation situation, there are generally two ways to install the end:
1. At the end of the main pipe loop and 3 pipes in the same way
When the main engine adopts the three-pipe method of the main line on the same route, the main pipe at the end needs to adopt the ring plus three pipes in the same route accordingly. As shown in Figure 4, the host is on the same route. At level crossings, there is a set of main lines at each corridor crossing, so the three corridor crossings must also travel the same way.


1. At the end of the main pipe loop and 3 pipes in the same way

A set of main line, including the water inlet and the backwater. After the main line reaches the end, the three ends will also be on the same route. If the same route is not done, the water flow at the entrance of the upper corridor will be large, while the water flow at the entrance of the lower corridor will be small. . The principle of the same process at the end is the same as the principle of the same process with the main engine, and it is necessary to ensure that the flow of water in and return at each end is the same length.
2. The end main pipe loops in the same way
Correspondingly, when there are a large number of hosts, the same route installation is selected for the main line loop mode, so that each fluid has the same length through the end, and the installation principle is the same as that of the host loop installation.

The end main pipe loops in the same way


As shown in Figure 5, for the heating of a three-story building, first of all, it is necessary to ensure that the distance of the fluid to each corridor entrance is the same. When the stairs reach the corridor entrance, they reach each heating user's home through the water divider on the outside of the corridor. The pipelines are installed in the same way. .
And each user’s home also has a water separator, that is, the room water separator inside the corridor. The heating pipes at the end of each room that reach the user’s home through the water separator also need to be installed in the same process. Then, the entire system forms a circular process, and the fluid not only has the same distance to each household, but also has the same distance to each room of the user.
Therefore, even if there are more floors and the number of heating users, the installation method of the same route in the ring can ensure that the heating effect of each user is equivalent. Of course, due to the different heating terminal styles of users, the difference between the room's heat preservation effect and the user's usage may lead to certain differences in the heating effect.

AQUA case

4. The initial investment of Tongcheng installation is high, but the advantages are obvious
Large-scale hot water or heating projects are installed in the same process. Due to the increase in the length of pipelines and the increase in accessories such as water separators, control valves, and pressure gauges, the initial investment cost of installation has increased a lot compared with remote installation. With the return pipe, the length of the pipe increases and the water resistance increases, which increases the energy consumption of the water pump, but the effect of its later operation is obvious.
First of all, the water flow of each device in the same process installation is even, the distribution of cold and heat is even, the front end of the circulation system is the same as the back end, for the end, there will be no front end heat (cold) and back end cold (hot) phenomena. , To ensure the user's experience; for the heat pump unit, there will be no small temperature difference between the front-end unit and large temperature difference between the back-end units, so as to ensure that the unit is balanced and working normally.
Secondly, the same process installation is convenient for equipment maintenance, and closing any equipment will not affect the overall cycle. If a certain equipment fails during operation, the waterway valves on both sides of the equipment can be closed for maintenance during system operation. Will affect the overall operation.
Copyright: Wang Yanming, a technical businessman

20 years of brand strength , Professional technical team, The product meets the standard, At your service

Related articles

  • 020-32583997
主站蜘蛛池模板: 精品少妇人妻av无码专区 | 天天做天天大爽天天爱 | 久久综合九色综合97欧美 | 国产亚洲精品aa片在线观看网站 | 久久9久久| 亚洲色爱免费观看视频 | 97精品人妻系列无码人妻 | 黑人巨大精品oideo | 少妇极品熟妇人妻200片 | 国产毛片毛片毛片毛片毛片毛片 | 亚洲欧美日韩精品专区 | 久久国产精久久精产国 | 亚洲乱码高清午夜理论电影 | 国产又粗又猛又爽又黄91 | 久久久青草青草免费看 | 白又丰满大屁股bbbbb | 日韩色图在线观看 | 成人婷婷 | 色悠久久久久综合先锋影音下载 | 亚洲国产麻豆 | wwxx日本 | 人妻丰满熟妇av无码区app | 亚洲视频一区二区在线观看 | 中文在线观看免费高清 | 秋霞无码久久一区二区 | 精品av国产一区二区三区四区 | 一区二区三区毛aaaa片特级 | 成人福利在线播放 | 亚洲精品美女久久久 | 日韩网| 久人人爽人人爽人人片av | 国产在线视频国产永久 | 久久久97| 国产精品主播一区二区三区 | 中日精品一色哟哟 | 18xxxx日本 | 黄色片xxxx| 99cao| 国模大胆一区二区三区 | 免费久久99精品国产自在现线 | 欧美日韩美女 | 国产成人综合美国十次 | 就操成人网| 欧美 日韩 成人 | 中文字幕久久精品一区二区三区 | 日韩精品无码av成人观看 | 深夜网站在线观看 | 亚洲日韩在线观看免费视频 | 狠狠狠色丁香综合婷婷久久 | 成人啪啪色婷婷久 | 四虎av影院 | 国产精品黄在线观看免费软件 | 国产三级a三级三级 | 日韩av二区 | 人人澡人摸人人添 | 国产小视频在线观看免费 | 三个男吃我奶头一边一个视频 | 亚洲国产成人精品久久久 | 午夜视频入口 | 日韩一级久久 | 三级无码在钱av无码在钱 | 国产亚洲欧洲av综合一区二区三区 | 国产最新自拍视频 | 伊人精品成人久久综合全集观看 | 国产嫩草在线 | 久久精品国产99国产精品澳门 | 在线日韩av免费永久观看 | 国产无遮挡a片又黄又爽 | www.久久99| 九九99热久久精品离线6 | 激情av中文字幕 | 亚洲熟女少妇一区二区 | 国产一区二区三区精品av | 午夜久久福利 | 天堂网资源中文最新版 | 99久久99久久精品国产片桃花 | 狠狠色噜噜狠狠狠狠av | 免费无码专区毛片高潮喷水 | 欧美日韩一区二区三区视频播放 | 永久免费无码成人网站 | 免费午夜福利在线观看视频 | 男人的天堂中文字幕 | 成年站免费网站看v片在线 国产福利在线视频蜜芽tv | 国产丰满老熟妇乱xxx1区 | 四虎精品在线 | 亚洲 欧美日韩 综合 国产 | 97干视频 | 国产一在线 | 国产精品久久久久久人妻无 | 免费av不卡| 国产亚洲色婷婷久久99精品 | 蜜臀av粉嫩av懂色av | 水蜜桃久久 | 欧美黄色免费在线观看 | 欧美日韩亚洲中文字幕一区二区三区 | 自拍偷拍三级 | 无码日韩做暖暖大全免费不卡 | 亚洲最大激情网 | 激情文学另类小说亚洲图片 | 主站蜘蛛池模板: 91av久久 | 亚洲a视频在线 | 国产剧情国产精品一区 | 777天堂麻豆爱综合视频 | 六月婷婷在线观看 | 欧美日韩在线视频观看 | 97久久综合区小说区图片区 | 熟女少妇人妻黑人sirbao | 女人和拘做受全程看视频 | 亚洲国产精品久久久久秋霞小 | www.av777| 亚洲视频在线视频 | 亚洲乱轮 | 操碰久久 | 日本强伦姧熟睡人妻完整视频 | 中文字幕无线码中文字幕免费 | av中文字幕第一页 | 色天天天 | 色综合av| 丰满人妻被黑人连续中出 | 亚洲殴美国产日韩av | 亚洲成a∨人片在线观看无码 | 日本午夜网站 | 最近2019免费中文第一页 | 日韩亚洲国产综合αv高清 狠狠免费视频 | 懂色av一区二区三区蜜臀 | 奇米影视奇米色 | 四虎国产精品永久在线国在线 | 国产无遮挡又黄又爽不要vip软件 | 又大又粗又爽又黄的少妇毛片 | 高潮毛片无遮挡高清免费 | 午夜福利精品导航凹凸 | 越猛烈欧美xx00动态图 | 亚洲国产成人精品无码区在线网站 | 欧美日韩视频网站 | 国产资源视频 | 老子影院午夜伦不卡无码 | 最新国产久免费视频在线观看 | 影音先锋日日狠狠久久 | 国产欧美日韩在线播放 | 99re66久久在热青草 | 色婷婷综合久久久中文字幕 | av色网站| 男女爽爽午夜18污污影院 | 蜜桃久久av | 1000部拍拍拍18勿入免费视频 | 男女激烈床震gif动态图免费 | 中文丝袜人妻一区二区 | 日b视频免费看 | 亚洲美女视频高清在线看 | 在线看片免费人成视频福利 | 国产精品一区二区av麻豆 | 亚洲美女被黑人巨大在线播放 | 亚洲综合久久成人av | 精品在线视频免费观看 | 亚洲中文字幕无码日韩 | 免费人成在线观看视频高潮 | 免费吃奶摸下激烈视频青青网 | 日日碰狠狠添天天爽超碰97久久 | 欧牲交a欧美牲交aⅴ | 欧美亚洲精品在线观看 | 天天草夜夜草 | 极品粉嫩国产48尤物在线播放 | 精品777 | 在线观看国产亚洲 | 日韩内射激情视频在线播放免费 | 老色鬼永久视频网站 | 亚洲国产精品嫩草影院久久 | 无码精品、日韩专区 | 欧美乱妇狂野欧美视频 | 再深点灬舒服灬太大了快点91 | 欧美午夜精品久久久久免费视 | 色综合视频网 | 国产91欧美| 97人妻熟女成人免费视频 | 欧美亚洲自偷自拍 在线 | 日本不卡久久 | 精品无码一区二区三区水蜜桃 | 国产午夜亚洲精品国产成人小说 | 欧美精品一卡二卡 | 亚洲日本视频在线观看 | 麻豆成人久久精品综合网址 | 国产成人美女视频网站 | 亚洲综合在线播放 | 婷婷激情综合色五月久久竹菊影视 | 久久国产黄色片 | 神马影院一区二区三区 | 国产精品国产三级国产普通话对白 | 一区二区高清国产在线视频 | 99久久免费只有精品国产 | 日韩亚洲制服丝袜中文字幕 | 天天爽天天操 | 国产午夜人做人免费视频中文 | 男女晚上日日麻批视频 | 国产真实交换配乱婬95视频 | 大伊香蕉精品一区视频在线 | 亚洲天天做日日做天天欢 | 国产乱码一二三区精品 | 中文亚洲爆乳av无码专区 | 主站蜘蛛池模板: 免费国产视频在线观看 | 好男人www社区 | 久久精品视频久久 | 国产精品午夜视频 | 天堂视频在线 | 香蕉久久精品 | 天天做天天爱夜夜爽 | 色妞色综合久久夜夜 | 日韩欧美成人一区二区三区 | 亚洲中文精品久久久久久 | 亚洲欧洲精品成人久久曰 | 国内视频一区 | 中文字幕在线亚洲二区 | 中文人妻av久久人妻水密桃 | 日本婷婷 | 国产精品夜夜春夜夜爽久久 | 永久黄网站色视频免费观看 | 日韩精品视频免费播放 | 亚洲日本在线观看 | 露脸国产精品自产拍在线观看 | 青青青免费视频观看在线 | 999精品免费视频 | 国产视频分类 | 久久久噜噜噜久久中文字幕色伊伊 | 香蕉久久夜色精品升级完成 | 国产成人精品午夜福利软件 | 成人无号精品一区二区三区 | 人人爽人人澡人人人妻 | 亚洲综合欧美色五月俺也去 | 久久国产成人午夜av影院 | 亚洲精品久久久久中文第一幕 | 国产爆乳美女娇喘呻吟 | 少妇又色又爽又黄的视频 | 精品国产污污免费网站入口爱酱 | 97香蕉超级碰碰碰久久兔费 | 国产无套内射久久久国产 | 激情欧美一区二区免费视频 | 国产精品嫩草影院一二三区入口 | 日本高清视频色欧www | 欧美日韩v | 公么大龟弄得我好舒服秀婷视频 | 1717国产精品久久 | 亚洲精品蜜桃久在线 | 亚洲国产成| 亚洲九九视频 | 少妇人妻精品一区二区 | 成人毛片av免费 | 国产婷婷色 | 无码人妻出轨黑人中文字幕 | 欧美日本韩国亚洲 | 中文字幕视频二区 | 波多野结衣在线观看视频 | 国产人妻一区二区三区久 | 欧洲色网 | 国产成人久久综合第一区 | 在线黄色大片 | 中文字幕黄色av | 国产精品久久久久久久久久直播 | 黄色三级在线观看 | 91av官网 | 亚欧美无遮挡hd高清在线视频 | 亚洲欧美国产成人综合欲网 | 不卡的av在线播放 | 国产精品青青在线观看爽 | 在线免费观看一区二区 | 污污在线免费观看 | 少妇又紧又深又湿又爽视频 | 91免费观看视频 | 国产精品一区二区在线观看99 | 伊人色综合网久久天天 | 啦啦啦免费高清视频在线观看 | 成人狠狠干 | 国产精品_国产精品_k频道w | 精品少妇爆乳无码av无码专区 | 另类亚洲小说图片综合区 | 欧美另类xxxx野战 | 婷婷五月花 | 久久久噜噜噜www成人网 | 亚洲人精品 | 亚洲欧美91 | www久久久久 | 亚洲精品在看在线观看高清 | 免费网站av | 一本色综合网久久 | 美女视频一区二区三区 | 日产电影一区二区三区 | 日本黄色高清 | 国产午夜无码片在线观看网站 | 国产一区二区免费看 | 好爽好湿好硬好大免费视频 | 精品无人区无码乱码大片国产 | 又硬又水多又坚少妇18p | 久久久久人妻一区精品色 | 一边吃奶一边添p好爽故事 超碰av在线 | 国产a一区| 日本久久高清一区二区三区毛片 | 都市激情校园春色亚洲 | 日本一区二区三区精品视频 | 在线色综合 |