Is there an imbalance in the amount of water and heat in a large-scale hot water project? Pictures and texts teach you design and installation!

Release date:2021-04-01

Are you still worrying about swimming pool filtration, disinfection and other issues? Click for free consultation and answer your questions one-on-one.

According to many dealers, when doing large-scale hot water or heating projects, uneven flow and heat distribution often occur. Due to the continuous maturity of air energy products and technological advancement, the performance of the unit will not have major shortcomings. Under the premise of reasonable selection of the unit, the uneven distribution of the end heat source is likely to be caused by improper system design during the installation process. The same process installation can avoid this phenomenon.


AQUA case


1. Simultaneous installation is the best way of hydraulic balance
In general, small-scale engineering dealers use remote installations to facilitate installation and save costs. Due to the short length of the pipeline, the difference between each end is not very obvious, so its shortcomings are also ignored. However, there are also some dealers who install flow regulators on each parallel branch for control.
The same process means that the path length of the fluid passing through each device is equal and the resistance is the same. This is also very difficult to understand, because you have to paint by yourself during the actual operation, so it is quite troublesome.
The length of the pipe passing through each parallel loop is basically the same. If the resistance loss through each meter of pipe is nearly equal, the resistance of the pipe network can be kept balanced without adjustment. The same process system can ensure that the water flow through each end is uniform, and prevent insufficient water flow at the remote end to affect the cooling or heating effect. The same process installation is very common in large-scale air-conditioning and refrigeration projects. Because the principles of heat pumps and air-conditioning are similar, they are gradually adopted by some air energy distributors. After continuous testing, they are widely used in large-scale air energy hot water and heating projects.
Taking heating as an example, the backwater of the first group of radiators at the front does not circulate to the main pipe temporarily, but continues to go down through the extension of the pipe, connecting the return pipe of the next group of radiators, and so on, from the end The radiator pulls out a return pipe and returns to the return pipe of the main pipe.
The water flow of each group of radiators in the system is basically the same. The system is very balanced. Generally, there will be no insufficient heat or no heat at the end of the system. It can be said that it is a way to balance the best hydraulic system.


Simultaneous installation is the best way of hydraulic balance

As shown in Figure 1, there are three hosts. Many people install them in this way, but there will be problems with more than five. Just imagine where the water flow is where the resistance is small and where the pipe diameter is short, then it flows there. Uneven distribution will occur. There will be more water flow on the right side, and less and less water flow to the left. This will also cause the temperature difference on the right side to be small. The more the temperature difference is to the left, the greater the temperature difference. Not the same journey.


AQUA case


2. There are many detailed requirements for the host installation in the same process
In order to avoid uneven distribution of the heat source at the end, the same process should be used when installing two or more units in parallel. For the same process, the path length of the fluid through each device must be equal and the resistance must be the same. According to the number of units, there are generally two ways for the host in the same journey:
1. The way of 3 pipes for main road:


Supervisory road 3 tube way
As shown in Figure 2, the rectangle in the figure represents the heat pump host, and the circle represents the circulating water pump.
After the fluid comes out of the water pump, it enters the heat pump host in three ways. Because the lengths of the water inlet pipes of the three hosts are inconsistent, there should be differences in the water outlet pipes, so that the path length of the fluid through each device is equal.
For example, the hosts are arranged in parallel. The inlet pipe of the first host is 3 meters, the second inlet is 4 meters, and the third inlet is 5 meters. If the first outlet is 8 meters, then the second The water outlet pipe of the main engine is 7 meters, and the water outlet pipe of the third main engine is 6 meters, so that the path length of the fluid through each device is 11 meters.


2. Main road ring way


2. Main road ring way

As shown in Figure 3, the rectangle in the figure represents the heat pump host, and the circle represents the circulating water pump: 1 is a circulating water pump (2 units); 2 is a 25P heat pump unit; 3 is a strong electric control cabinet (distribution cabinet); 4 is Weak current control cabinet; 5 is the main water inlet pipe (on the bottom); 6 is the main water outlet pipe (on the top).
There are 5 main engines. Large engineering water pumps need one for one use and one for preparation. After the fluid comes in, it should not pass through the first device first, go to the end first, and then come back. The path lengths of all the devices are the same.
In order to improve the overall efficiency and service life of the system, improve the customer's experience, and at the same time facilitate daily maintenance, the following aspects need to be paid attention to during the installation of the host in the same process
①The side of the unit's own electric control box and the power distribution cabinet are in the front for maintenance; ②The three main inlet and outlet pipes are behind the groups, two inlet pipes are below, and the outlet pipes are on the top; The distance between the pump center is 1.2 meters; ③The center of the water pump is 1.5 meters away from the side panel of the unit; the power distribution cabinet and the weak current cabinet are installed in the middle of the N units, in the same straight line with the front panel of the unit, and the bottom edge is 1.5 meters from the ground. The distance between the unit and the unit should not affect the maintenance of the machine. Each control cabinet can control up to 10 units. For projects with more than 10 units, the control cabinet should be added and the unit control number should be evenly distributed; the interface between the unit and the pump must be installed with a soft Connect to reduce noise and facilitate installation and maintenance; ④For installations on the ground, the unit support should be installed on the concrete foundation, and the concrete foundation platform should be provided with drainage ditch; for installations on the roof, the unit support should be stressed. The waterproof insulation layer should not be damaged; ⑤ Rubber shock-absorbing pads should be installed between the unit and the water pump and the fixed bracket.


AQUA case


Three, the end of the same process and the host at the same time
The terminal equipment of a large-scale hot water or heating project is generally a radiator or fan coil or floor heating. When the host is installed in the same process, only the end can be installed in the same process to ensure the uniform output of the end.
According to the number of hosts and the same process installation situation, there are generally two ways to install the end:
1. At the end of the main pipe loop and 3 pipes in the same way
When the main engine adopts the three-pipe method of the main line on the same route, the main pipe at the end needs to adopt the ring plus three pipes in the same route accordingly. As shown in Figure 4, the host is on the same route. At level crossings, there is a set of main lines at each corridor crossing, so the three corridor crossings must also travel the same way.


1. At the end of the main pipe loop and 3 pipes in the same way

A set of main line, including the water inlet and the backwater. After the main line reaches the end, the three ends will also be on the same route. If the same route is not done, the water flow at the entrance of the upper corridor will be large, while the water flow at the entrance of the lower corridor will be small. . The principle of the same process at the end is the same as the principle of the same process with the main engine, and it is necessary to ensure that the flow of water in and return at each end is the same length.
2. The end main pipe loops in the same way
Correspondingly, when there are a large number of hosts, the same route installation is selected for the main line loop mode, so that each fluid has the same length through the end, and the installation principle is the same as that of the host loop installation.

The end main pipe loops in the same way


As shown in Figure 5, for the heating of a three-story building, first of all, it is necessary to ensure that the distance of the fluid to each corridor entrance is the same. When the stairs reach the corridor entrance, they reach each heating user's home through the water divider on the outside of the corridor. The pipelines are installed in the same way. .
And each user’s home also has a water separator, that is, the room water separator inside the corridor. The heating pipes at the end of each room that reach the user’s home through the water separator also need to be installed in the same process. Then, the entire system forms a circular process, and the fluid not only has the same distance to each household, but also has the same distance to each room of the user.
Therefore, even if there are more floors and the number of heating users, the installation method of the same route in the ring can ensure that the heating effect of each user is equivalent. Of course, due to the different heating terminal styles of users, the difference between the room's heat preservation effect and the user's usage may lead to certain differences in the heating effect.

AQUA case

4. The initial investment of Tongcheng installation is high, but the advantages are obvious
Large-scale hot water or heating projects are installed in the same process. Due to the increase in the length of pipelines and the increase in accessories such as water separators, control valves, and pressure gauges, the initial investment cost of installation has increased a lot compared with remote installation. With the return pipe, the length of the pipe increases and the water resistance increases, which increases the energy consumption of the water pump, but the effect of its later operation is obvious.
First of all, the water flow of each device in the same process installation is even, the distribution of cold and heat is even, the front end of the circulation system is the same as the back end, for the end, there will be no front end heat (cold) and back end cold (hot) phenomena. , To ensure the user's experience; for the heat pump unit, there will be no small temperature difference between the front-end unit and large temperature difference between the back-end units, so as to ensure that the unit is balanced and working normally.
Secondly, the same process installation is convenient for equipment maintenance, and closing any equipment will not affect the overall cycle. If a certain equipment fails during operation, the waterway valves on both sides of the equipment can be closed for maintenance during system operation. Will affect the overall operation.
Copyright: Wang Yanming, a technical businessman

20 years of brand strength , Professional technical team, The product meets the standard, At your service

Related articles

  • 020-32583997
主站蜘蛛池模板: 日日摸日日碰夜夜爽av | wwwwxxxx欧美 | 国产91小视频 | 亚洲午夜网 | 女人被狂躁60分钟视频 | 华人色| 无修无码h里番在线播放网站 | 亚洲成人日韩 | 午夜久久乐 | 双腿张开被9个黑人调教影片 | 日韩中出 | av懂色 | 国产精品人人妻人人爽人人牛 | 久久精品国语 | 国产 丝袜 欧美中文 另类 | 国产免费拔擦拔擦8x在线播放 | 69久久 | 中文字幕乱码中文乱码51精品 | 2021在线精品自偷自拍无码 | 亚洲日韩精品无码专区网站 | 成人无码精品一区二区三区亚洲区 | 中日韩黄色一级片 | 欧美人与动牲交zooz乌克兰 | 精品人妻无码一区二区色欲产成人 | 国产成人亚洲精品无码mp4 | 欧美激精品 | 92精品国产自产在线观看481页 | 丰满人妻熟妇乱偷人无码 | 国产精品高潮呻吟av久久软件 | 日韩av大片| 曰本无码超乳爆乳中文字幕 | 欧美大荫蒂毛茸茸视频 | 无码人妻av免费一区二区三区 | 国产成人精品aa毛片 | 国产片在线天堂av | 日本免费精品 | 最新国产成人ab网站 | 欧美人妻少妇精品久久黑人 | 国产在线www | 成年网站在线 | 亚洲中文字幕无码一区二区三区 | 精品一区欧美 | 在线综合色| 欧美成人猛交69 | 成人免费福利视频 | 国产黄a三级三级三级 | 欧美双人家庭影院 | 日韩在线视频播放 | 少妇av网| 亚洲一卡二卡在线观看 | 狠人干练合综合网 | 美女内射毛片在线看 | 日日碰狠狠躁久久躁综合小说 | 国产精品毛片完整版视频 | 在线高清理伦片a | 99久久精品费精品国产一区二区 | 国产顶级毛片 | 欧美日本亚洲韩国一区 | 国产精品久久久久这里只有精品 | 久久中文娱乐网 | 亚洲精品无码一区二区 | 成年人免费小视频 | 狠狠干in | 极品少妇的粉嫩小泬视频 | 精品久久久久久久久久久国产字幕 | 性色av蜜臀av浪潮av老女人 | 大香伊蕉国产av | 亚洲精品乱码久久久久久蜜桃图片 | 亚洲日韩中文字幕在线不卡最新 | 亚洲国产成人精品无码区在线网站 | 日本三级不卡 | 欧美乱人伦视频在线 | 亚洲老鸭窝一区二区三区 | 国产av无码专区亚洲精品 | 成 人 黄 色 片 在线播放 | 亚洲日韩中文字幕在线不卡最新 | 亚洲第一性理论片 | 天天摸天天做 | www.999热 | 成人天堂资源www在线 | 99在线精品视频免费观看软件 | 国产伦精品一区二区三区千人斩 | 欧美一级片在线 | 精品国精品国产自在久国产不卡 | 黄色在线观看免费视频 | 色窝窝色蝌蚪在线视频 | 精品久久伊人99热超碰 | 天天操天天玩 | 久国产视频 | 欧美老妇与zozoz0交 | 日韩欧美大片在线观看 | 色网站在线 | 精品成人毛片一区二区 | 人久久精品中文字幕无码小明47 | 欧美人与禽zoz0性伦交 | 久久精品人妻无码一区二区三区v | 偷拍亚洲综合 | 亚洲精品国偷拍自产在线麻豆 | 在线看毛片的网站 | 主站蜘蛛池模板: 色综合伊人丁香五月桃花婷婷 | 一本色道久久综合狠狠躁篇 | 中文字幕人妻不在线无码视频 | 综合色视频 | 国产精品国产三级国产av剧情 | 专干老肥女人88av | 久久色图| 午夜宅男网| 午夜精品久久久久久久99热 | 少妇无码av无码专线区大牛影院 | 国产人妻鲁鲁一区二区 | 亚洲两性| 国产日本一区二区 | 一本到免费视频 | 亚洲成色最大综合在线 | 97精品人人a片免费看 | 全国最大成人网 | 国产乱国产乱 | 久久国产乱子伦精品免费乳及 | 亚洲少妇视频 | 欧美成人激情 | 北条麻妃一二三区 | 黄色avav | 老司机福利av | 久久久久久久999 | 婷婷天堂网 | 好大好硬好爽免费视频 | 日韩精品少妇 | 国产亚洲精品久久久久久入口 | yjizz国产 | www.夜夜操 | 欧美性大战久久久久久 | 美女视频久久 | 国内精品久久久久av福利秒拍 | 一级美女视频 | 亚洲小说区图片区色综合网 | 亚洲精品国产精品国产 | 台湾久久| 欧美福利网站 | 日韩欧美区 | 欧美一级黄色网 | 亚洲六月丁香色婷婷综合久久 | 中国亚洲女人69内射少妇 | 九一精品视频 | 无码日韩精品一区二区免费 | 国产v在线在线观看视频 | 成年在线观看免费视频 | 免费视频好湿好紧好大好爽 | 999国内精品视频免费 | 野花社区www视频最新资源 | 亚洲三级一区 | 亚洲日本在线在线看片 | 91久久国产综合久久 | 亚洲中文字幕乱码电影 | 久久久精品人妻一区二区三区gv | 免费小视频在线观看 | 午夜影院在线播放 | 成人综合一区 | 亚洲草逼| 亚洲a一级| 动漫h无码播放私人影院 | 黄色综合 | 日韩欧美在线不卡 | 国产在线精品无码av不卡顿 | 亚洲国产精品成人影片久久 | 中国一级免费毛片 | 成年男人裸j照无遮挡无码 国产精品久久久免费视频 狠狠干狠狠撸 | 黄色高潮视频 | 中文精品久久久久国产网址 | 91成人免费观看视频 | 亚洲卡一卡二新区 | 国产精品无码无卡在线观看久 | 久久爱www人成狠狠爱综合网 | www.色妞 | 亚洲人人在线 | 久爱www人成免费网站 | 国产精品欧美亚洲韩国日本久久 | 麻豆久久久久久久久久 | 熟女毛片| 国产真实的和子乱拍在线观看 | 国产成人亚洲精品另类动态 | 成人aaaa| 韩国三级无码hd中文字幕 | 精品小视频 | 91九色国产视频 | 亚洲天天看 | 性一交一乱一色一视频 | 日本三级视频 | 日本成人免费在线视频 | 欧美日韩在线一区 | 亚洲色成人一区二区三区小说 | 亚洲精品综合网在线8050影院 | 成年av动漫网站久久 | 国产午夜无码片在线观看 | 亚洲色大成网站www看下面 | 欧美另类与牲交zozozo | 国产色播av在线观看 | 亚洲国产精品无码久久久 | 香蕉久久夜色精品 | 主站蜘蛛池模板: 国产黑色丝袜在线看片不卡顿 | 成 年 人 黄 色 大 片大 全 | 国产cao | 手机av片| 欧美无遮挡很黄裸交视频 | 欧美大胆少妇bbw | 国产明星精品无码av换脸 | 亚洲国产精品久久一线不卡 | 亚洲一级免费看 | 东京热一本无码av | 午夜动态图 | 国产激情一区二区三区 | 91成人品 | av天堂久久天堂色综合 | 亚洲不卡免费视频 | 少妇被黑人4p到惨叫在线观看 | 中文字幕精品亚洲人成在线 | 成人国内精品久久久久影院 | 亚洲日韩穿丝袜在线推荐 | 久久精品人妻一区二区三区 | 激情91 | 日韩欧美高清在线 | 骚虎av在线网站 | 国产自美女在线精品尤物 | 葵司av在线| 国产美女被遭强高潮免费一视频 | 日韩精品免费一区二区夜夜嗨 | 亚洲精品国产手机 | 五月天六月婷婷 | 五月丁香久久综合网站 | 国产精品白浆无码流出 | 国产农村乱人伦精品视频 | 中文字幕精品在线视频 | 亚洲伊人久久影院 | 三级黄色免费片 | 精品熟女碰碰人人a久久 | 亚洲中文无码成人片在线观看 | 中文字幕在线视频一区 | 亚洲国产另类精品 | 亚洲成在人线aⅴ免费毛片 欧美影院成年免费版 | 97久久超碰国产精品旧版麻豆 | 国产免费高清av | 成人久久久久久 | 中文字幕乱码中文乱码777 | 女人和拘做受全程看视频 | 国产精品美女久久久免费 | 精品久久久久久中文字幕无码vr | 国产丰满乱子伦无码专 | 丁香久久 | 亚洲最新av在线 | 亚洲第7页 | 色婷婷aⅴ | 亚洲精品久久久狠狠狠爱 | 国产资源免费观看 | 亚洲国产中文在线 | 两女女百合互慰av赤裸无遮挡 | 麻豆精品久久久久久久99蜜桃 | 成人在色线视频在线观看免费大全 | 最新的国产成人精品2021 | 人妻尝试又大又粗久久 | 欧美狠狠干 | 日本在线观看视频网站 | 国产一级aa大片毛片 | 中韩毛片 | av自拍偷拍 | 97精品在线观看 | 挺进朋友人妻雪白的身体韩国电影 | 亚洲综合一 | 中文字字幕在线观看 | 人妻久久久精品99系列a片毛 | 国产精品福利在线 | 国内精品久久久久久久电影视 | 视频一区视频二区制服丝袜 | 国产成人午夜福利院 | 亚洲a∨国产av综合av | 在线亚洲综合 | 成 人 网 站 在 线 免费 观 看 | 国产精品资源一区二区 | www.激情五月 | 国产精品一区在线观看你懂的 | 欧美天堂| 国产人无码a在线西瓜影音 香蕉97超级碰碰碰免费公开 | 波多野结衣视频在线播放 | 少妇精品无码一区二区三区 | 91日韩欧美 | 久久亚洲精品大全 | 亚洲第一页视频 | 91视频第一页| 亚洲欧洲日产国码aⅴ | 日韩国产精品一区二区 | 久久精品成人一区二区三区蜜臀 | 午夜性色福利在线视频18观看 | 国产美女又黄又爽又色视频免费 | 亚洲精品国产一区二区 | 亚洲日韩国产av中文字幕 | 国产白嫩受无套呻吟 | 国产人成无码视频在线 | 意大利性荡欲xxxxxx | 国产tv在线观看 |